OUR PROCESS
CREATE YOUR VISION - IDEAL BATHROOM
Pick a style/theme/colour palette that will create your dream/ideal bathroom.
​
STYLES - While there are many, I have listed a few below as a starting point. Modern/ Classic/ Coastal/Contemporary/Hamptons/Country, ETC.
THEMES - Linked to your personal style choice, adding more layers and character. ​
COLOURS - Make sure they tie in with with your style choice and overall theme.
​
-
Look for inspiration online.
Google images/ Pinterest/ Tile Cloud.
​
-
Fittings and fixtures inspiration online
Highgrove bathrooms/ Reece/ ABI
​
-
Tile Inspiration in store. Gold coast local tile shops
Beaumont tiles/ Nerang tiles/ Burleigh tiles​.
When you first begin, keep an open mind. The choices out there can seem endless, but by narrowing down the style, theme and colour palette it gets easier.
​
Really go after the look you want.
![Bathroom renovation builders with design experience](https://static.wixstatic.com/media/1fc070_e1334eb716914094b5e393bfa292dd15~mv2.webp/v1/fill/w_491,h_536,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/1fc070_e1334eb716914094b5e393bfa292dd15~mv2.webp)
![Bathroom renovation plans. Design your bathroom layout. Plan your fixtures and fittings choices](https://static.wixstatic.com/media/e24b3a5346014b9691dcd95da6c58f94.jpg/v1/fill/w_491,h_327,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/e24b3a5346014b9691dcd95da6c58f94.jpg)
WORK OUT AN ACTION PLAN
-
Meet on site. Address current bathroom flaws and problems.
-
Discuss what your ultimate bathroom will look like and provide you with possible solutions.
-
Work out the size and scope of your bathroom renovation. What you can afford, who will be using it, and what your needs might be.
-
Discuss floor plan, layouts, styles and any structural changes needed/desired.
-
Talk about start dates and time lines for the project.
-
Discuss your budget and the best way to source fixtures and fittings for your bathroom according to your budget.
-
Some questions you may ask yourself while planning
Do the existing plumbing locations work for you or not?
Do I want more storage space?
How do you feel about the shower size and functionality?
Does the bathroom need extra lighting, power points?
​
​
CONFIRMATION OF DETAILS
-
Provide a quote for your new bathroom.
-
Make sure all fitting and fixtures are chosen/ordered and you are 100% happy.
-
Have a clear floor plan, with the location and type of fixtures and fittings to be installed.
-
Signed contract with costings - deposit paid.
-
QBCC Home warranties Insurance paid for and Start date set.
![Bathroom renovation contracts and information.](https://static.wixstatic.com/media/65e62089ce0748ebbc8092d4a21ed63b.jpg/v1/fill/w_491,h_332,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/65e62089ce0748ebbc8092d4a21ed63b.jpg)
![Bathroom renovation Process and work. Use licensed bathroom trades.](https://static.wixstatic.com/media/11062b_ff54491d23f8445cafa681ba481aba5a~mv2.jpg/v1/fill/w_491,h_327,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/11062b_ff54491d23f8445cafa681ba481aba5a~mv2.jpg)
RENOVATION BEGINS
-
Once all fixtures and fittings have arrived. Preparation of home protection and dust reduction systems installed.
-
Skip bins or en-suites ordered and on site ready for use.
-
Demo work, structural changes, plumbing and electrical rough in take place.
-
Reline walls, ceilings and floors where required, flush all joints
-
Waterproof floor, screed, waterproofing entire bathroom.
-
Floor and wall tiling, grout and silicone.
-
Painting
-
2nd fix fit off, vanities, toilets, shower screens, mirrors, towel rails, etc.
-
Final Clean and handover.
ENJOY
-
We hope everything has come together as you imagined. The time for enjoying your new bathroom has arrived.
-
Once completed we like to stay in touch and check in. With a 3 month follow up call, followed by an inspection after 12 months.
![Enjoy your ne Bathroom renovation](https://static.wixstatic.com/media/11062b_569024b29ab54e5a91aeb64ee95bd85e~mv2.jpg/v1/fill/w_491,h_327,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/11062b_569024b29ab54e5a91aeb64ee95bd85e~mv2.jpg)